Your Pull-Down Attic Stairs Need a Cover Before Tear-Off Dust Arrives
Who covers the pull-down attic stairs, and who cleans up the dust that gets past the cover, is worth settling before the first shingle comes off.
Many Chesterfield houses have a pull-down attic stair set into a ceiling in a hallway, a closet, or a garage-side room. The hatch is usually a thin board or a panel with weatherstripping, and when the roof is torn off, the opening becomes a direct path between the attic and the rooms below it. Shingle granules, old nails, grit, and wood dust can drop through the hatch if nothing covers it. That is why the stair is a roof question, not only a house question, and it belongs in the bid before the crew arrives.
Most homeowners never think about the hatch until they find grit on the stair treads or a fine layer of dust in the closet. By then the roofers have usually moved on to the next slope. Asking about it before the work starts is simple, and the answers tell you a lot about how carefully each company plans the day.
Roofer comparison
Every roofer will say they protect the interior, but the method is what matters. Some crews lay a sheet of plastic or a drop cloth over the opening from the attic side and tape the edges. Others build a short cover board that sits in the hatch frame and seal its perimeter with painter's tape. Some do neither and depend on a homeowner to shut the stair. Each method can work, but they are not the same, and a bid that says only "we protect the interior" leaves the question open.
Ask each roofer who installs the cover, when it goes on, and who removes it. A cover placed by the crew at the start of tear-off and removed by the crew after the final sweep is clear. A cover that depends on the homeowner remembering to close the stair is not a plan. Ask whether the stair will be folded up and latched during the work, or left open for the crew to use. Some crews go into the attic to check decking, ventilation, or the back of the eave, and an open hatch makes that easy. A closed hatch with a cover in place means the crew has to come in through the roof, or accept the cover as a barrier to working in the attic at all.
Ask about cleanup inside the living space. A roofer who covers the hatch well may still leave dust on the landing, the stair treads, and the floor under the opening if the cover is pulled too quickly. Ask whether the crew vacuums or wipes the area under the stair before they leave for the day, and whether the final sweep includes the rooms below the hatch. The answer should name the room, not just say "the house."
Keep a written note of what each roofer says. If the scope does not mention the attic stair, ask for a line that describes the cover, who sets it, and who cleans the area below. A scope that names the stair is easier to hold a crew to than a verbal promise on the driveway.
What it costs
A drop cloth, plastic sheeting, and tape cost very little, and a cover board made from plywood costs a bit more but can be reused on other jobs. The real cost is the time the crew spends building the cover and cleaning the area below it. Some roofers include that time in the labor price. Others list it as a separate line, and some leave it out of the bid entirely and bill for it later as an extra. None of this is a reason to pick one roofer over another on price alone, but it is a reason to read each bid for what it includes.
Ask each roofer whether attic stair protection is part of the written price or an add-on. If the answer is an add-on, ask what it would cost and when it would be billed. A bid that is low because it leaves out the cover can look cheaper until the cover is added at the end of the job. Compare the bids on the same list of protections so the totals mean the same thing.
If a stair is damaged during the work, the repair is its own question. Ask who pays for a cracked stair frame, a bent hinge, or a torn lid, and whether that is written into the bid. Keys Roofing can answer questions about its scope at (314) 220-2333, and you can ask the same questions of every other company you are comparing.
What to ask
Start with the plan. Ask each roofer exactly how the attic hatch will be covered, what material they use, and who sets it in place before the first nail is removed. Ask whether the stair will be closed during the work or left open, and what happens if the crew needs to go into the attic. Ask whether the cover stays in place on days when the crew is off the roof, including the nights when the tarp is over the deck.
Then ask about the rooms below. Ask which room the stair opens into, whether the crew will walk through that room, and whether the floor under the hatch will be covered. Ask who cleans the stair and the area under it at the end of each day and at the final sweep. A short, specific answer is a good sign. A vague answer like "we clean up" should prompt a follow-up.
Finally, ask for the answer in writing. A line in the scope that says the attic stair will be covered, the cover will be removed at the end of the job, and the area below will be vacuumed is something you can check when the crew leaves. If a roofer will not put the plan in writing, that tells you something too.
- Who installs the cover, and when it goes on
- Whether the stair stays closed or open during the work
- Which room the hatch opens into, and whether the crew walks through it
- Who vacuums the stair and the floor below at the end of each day and at the final sweep
- Whether protection is in the written price or billed as an extra
- Who pays if the stair frame, hinge, or lid is damaged
A pull-down stair is a small part of a roof job, but it is one of the places where dust gets into the rooms you live in. Settling the plan before the work starts is the simplest way to keep the cleanup on the crew's side of the bid.
Have Keys Roofing look at it instead
A written scope from Keys Roofing covers every line on this page, because this page is a description of what a scope should contain. Compare it against the others line for line, which is the entire point.
A look at the roof here means photographs, measurements and a written scope you keep on file whether or not you hire anybody. If an insurance claim is part of your situation, the claim stays in your name and in your hands: under RSMo 407.725 a Missouri roofing contractor may not represent or negotiate a homeowner's insurance claim, and Keys does not. Keys documents what is on the roof and meets the adjuster there as the contractor.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else. Atlas and Malarkey shingles. Licensed and insured.
This goes to Keys Roofing, the company at number one on this site. It does not go to any of the other companies named here, and none of them receives anything you type into this form.