Chesterfield, Missouri Updated August 2026 Advertising disclosure
The document, not the number

Who Owns the Shingles Left in Your Driveway?

Compare how roofers handle surplus materials, return credits and the shingles you want kept for a later repair.

Fifteen line items Four common omissions One rule about change orders

Two roofing quotes can name the same shingle and still leave you with different things when the trucks pull away. One contractor includes an unopened bundle for your use later. Another takes all unused material back to the supplier. Neither arrangement tells you, by itself, whether the price is fair. The fact you need before signing is whether your agreed price includes a repair reserve, and who owns everything beyond it.

That question belongs in the comparison before delivery. Once bundles are stacked beside your Chesterfield driveway, it is easy to assume you bought every one of them. The contractor may have ordered those materials under a fixed price agreement that includes supplying the completed roof and returning unused stock. Settle that distinction on paper while both bidders can still explain their numbers.

Roofer comparison

Start by separating three things: material installed on the house, material deliberately left for you, and surplus the contractor intends to remove. A proposal that says only "materials included" does not explain the second or third category. Ask each bidder to describe all three, using the same requested reserve so you can compare the resulting totals.

A fixed price for a completed roof is different from an agreement that bills actual material costs plus labor and an agreed markup. With a fixed price, a supplier return does not automatically mean the homeowner receives a credit. Under an actual cost arrangement, the treatment of returns and credits needs to be explicit because those transactions can affect the bill. Read your agreement rather than inferring ownership from where the supplier unloads.

Extra material on delivery day is not, on its own, evidence of inflated roof measurements. Roof edges, valleys and other cuts create waste. Contractors also have to order in the quantities the supplier sells. The useful comparison is how each bidder explains the order and accounts for unused material under the proposed payment terms. A photograph of a stack of bundles cannot answer that.

Define the reserve separately from the surplus

A repair reserve is material intentionally handed over to you. Surplus is whatever remains after installation. If the proposal promises only "leftover shingles," you might receive several bundles, a few loose pieces or nothing. That wording does not commit the roofer to leaving a usable quantity.

Ask for a stated quantity of the field shingle, identified by manufacturer, product and color. Field shingles cover the main roof surfaces. Ridge caps and starter materials have different jobs, so a leftover package of either is not the same reserve. If you want those materials retained too, have them listed separately. Ask the bidder to explain a sensible quantity for your roof rather than assuming every house needs the same amount.

Keep the comparison narrow. You are asking what comes with this purchase, not asking the contractor to promise that a stored bundle will solve every future repair. The location and extent of damage, the condition of surrounding shingles and the availability of a suitable installer will still matter.

What it costs

Have each roofer state whether the agreed reserve is included in the quoted total or added as a separate charge. An included bundle still has a cost somewhere in the job price. A separate charge simply makes that cost visible. Compare the total for the roof and the same reserve, rather than rewarding whichever proposal happens to use the word "free."

Use a simple comparison request: "Please price the completed roof with one unopened bundle of the specified field shingle left with me, and explain how you handle all other unused materials." One bundle is a starting point for the conversation, not a claim that it will be enough. If a bidder recommends a different quantity, ask why and have the other bidder price that quantity too.

For an agreement based on actual costs, ask whether supplier credits reduce your final material charge, whether restocking fees apply, and how any markup is adjusted after a return. Request the supporting records the contract will require. Do this before signing, when the contractor can explain the accounting clearly. A disagreement over an unexplained credit is harder to resolve after the final invoice arrives.

For a fixed price agreement, ask whether adding a reserve changes the total and whether removing that reserve would reduce it. The contractor may price procurement and delivery as part of the whole project rather than as individual retail transactions. What matters is getting a definite answer before you choose between bids.

Saved shingles also do not make a later repair cost nothing. A roofer may still need to inspect the problem, gain safe access, remove damaged material and complete the repair. On a steep or awkward roof, the material you already own may be only a small part of that work. Treat the reserve as a known supply of a particular product, not prepaid repair labor.

What to ask

Send the same short set of questions to both contractors. Written answers let you compare the offer without relying on what someone remembers saying beside the driveway.

  • What exact material and quantity will you leave for me?
  • Is that reserve included in the total price?
  • Will the field shingles be in unopened, labeled packaging?
  • Who owns the remaining surplus, and who removes it?
  • Does any supplier return produce a credit under this agreement?
  • Where will you place my reserve, and what storage instructions apply?

Keep the label with the material

Ask the contractor to leave the original packaging and photograph its identifying information before putting the reserve away. Keep those photographs with your proposal and final invoice. "Brown architectural shingles" is not a useful product record when you need someone to assess a repair several years later. The manufacturer, product name, color and any production information on the package give that person something specific to check.

Storage deserves a decision before the crew leaves. Ask for the manufacturer's instructions and choose a location that follows them. Do not assume an outdoor stack under a loose cover is suitable for long term storage, or that someone should carry heavy bundles into your attic without discussing access and placement. Tell the roofer where the material is supposed to go and confirm whether moving it there is included.

A stored shingle has not had the same exposure as one on your roof. Sun, weather and accumulated dirt can change the installed roof's appearance. Keeping material from the job therefore does not guarantee an invisible repair later. It preserves a specific product for evaluation when the time comes.

Make the handoff part of completion

Before the crew removes the surplus, check the agreed reserve against the written description. Confirm the quantity, read the labels and photograph its condition. Keep loose scraps separate from the material you intend to store. If the promised unopened bundle was used to finish the roof, ask when the replacement bundle will arrive and record that outstanding item.

For a Chesterfield homeowner comparing Keys Roofing with another contractor, bring this question into the pricing conversation: "What material will belong to me after the roof is finished?" Call Keys Roofing at (314) 220-2333 and request that the proposed reserve, its cost and the treatment of remaining surplus be stated in the written quote.

Talk to a roofer

Have Keys Roofing look at it instead

A written scope from Keys Roofing covers every line on this page, because this page is a description of what a scope should contain. Compare it against the others line for line, which is the entire point.

A look at the roof here means photographs, measurements and a written scope you keep on file whether or not you hire anybody. If an insurance claim is part of your situation, the claim stays in your name and in your hands: under RSMo 407.725 a Missouri roofing contractor may not represent or negotiate a homeowner's insurance claim, and Keys does not. Keys documents what is on the roof and meets the adjuster there as the contractor.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else. Atlas and Malarkey shingles. Licensed and insured.

(314) 220-2333

This goes to Keys Roofing, the company at number one on this site. It does not go to any of the other companies named here, and none of them receives anything you type into this form.